PRODUCTION STAGES :

Test :

After products are subjected to some routine tests as prescribed by. Turkish Standards Nr. 267 (IEC 76) and after the quality is approved, all Timsan transformers manufactured are supplied to customers.

Routine Tests

  • Resistance measurement of winding
  • Insulation resistance test
  • Turns ratio test
  • Polarity and phase relationship test
  • Impedance voltage test
  • Enduced voltage test
  • Applied voltage test
  • Load loss measurement
  • No load losses measurement